Lincoln Castle Revealed
Client
Lincoln Castle
Project Status
Complete 2015
Building Grade
Grade I
Project Outline
Naomi was asked to take over the construction phase Project Management of this programme of works (£25m) at the point of delivery, due to HLF requirements for a PM with construction experience and an ability to troubleshoot. She was responsible for managing the Design Team, driving and managing the programme, reporting to the client organisation and the Heritage Lottery Fund. This project was completed successfully.
Featured Project
In 2021, the Science Museum Group received funding from the DCMS for the repair and conservation of the roof on the Station Hall, at the National Railway Museum. Naomi was appointed to deliver the project from inception to completion.